Concrete mixing
Your current location: 首 页 > Hot push information

Aba high quality vertical mixer use

2022-09-27
Aba high quality vertical mixer use

How do we distinguish the quality of concrete mixing station?The quality of cement is directly related to the quality and durability of the building, and is also the key link in the quality control of the mixing station!However, the current order of the cement industry is not good: unqualified clinker in cement clinker is widespread, the content is far below the standard value is normal, small cement can not be called cement, can only be called powder。Cement supervision is seriously missing!Testing strength, setting time and stability are far from enough。1、优质Vertical mixer用途Clinker: standard requirements, calcium silicate mineral is not less than 66%, calcium oxide and silicon oxide mass ratio is not less than 2。But are our cement factories often up to standard?Strength tests are usually performed only。2, cement clinker content: standard requirements, ordinary Portland cement clinker, gypsum content should be greater than or equal to 80%, less than 95%。But now, even if the large cement clinker content is generally only 65% to 70%, let alone the small cement plant near it in Beijing (in fact, can only be called the grinding station, do not know how to make a cement plant name), the general knowledge of small cement clinker is only about 50%。Small cement cannot be called cement。At best, it's a mixture!3.阿坝优质Vertical mixerTest method: Cement supervision by Technical supervision Bureau,Random inspection once a year,Can't restrain the production of cement plant!The inspection items of the national inspection standards only have strength, setting time and stability,Some chemical indicators are far from adequate!These indicators are easily met with small cement!We should strictly test the clinker,Clinker content testing should be increased when accepting cement,Not only strength, setting time and stability should be tested,当然,Magnesium oxide, trisulfur oxide and other chemical indicators can not be less!

Aba high quality vertical mixer use

阿坝优质Vertical mixerCompared with similar products on the market, the innovative HZS35 concrete mixing plant has many advantages: 1.In addition to the common sealing process, there are two steel bearing protective rings between the side mixing arm and the shaft head, which can prevent coarse sand from entering;2.The electric oil pump technology supplies oil vertically from four pump cores to four shaft heads, without diverting valves, reducing repair and maintenance costs;3.Vertical mixer用途Reducer reducer and oil seal system are designed and produced by well-known foreign manufacturers, longer service life, low noise, no oil leakage;4.Gear oil filtration/cooling system can be selected four generations of gear oil filtration and cooling system, military grade process, more durable。

Aba high quality vertical mixer use

Concrete mixing is an operation method of mixing cement, lime, water and other materials evenly。Concrete mixing is divided into two types: manual mixing and mechanical mixing of water。优质Vertical mixer用途Concrete mixing plant is widely used in China's industry, agriculture, transportation, national defense, water conservancy, municipal and other construction projects, the demand is increasing。Cement concrete mixing plant is widely used in China's industry, agriculture, transportation, national defense, water conservancy, municipal and other construction projects, the demand is increasing。Although the domestic concrete mixing equipment continues to innovate and progress on the basis of learning from foreign products, the technical level is gradually improved, but as far as the whole mixing station is concerned, the research on the batching process is still insufficient, especially for the new concrete mixing station, often rely on the experience accumulated by supporting manufacturers for many years.阿坝优质Vertical mixerIt basically meets the quality requirements of the national standard for concrete mixing station, and there is no special experimental research on its conveying technology and feeding technology。

Aba high quality vertical mixer use

HZS35 concrete mixing plant is a small concrete mixing equipment, the mixing plant adopts JS750 type double horizontal shaft forced mixing machine, special four-fold seal and electric oil pump technology, good mixing quality, high mixing efficiency, is the ideal choice for our customers。Installation Precautions 1.阿坝优质Vertical mixerInstallation of the mixer machine: the bottom plane of the mixer chassis is properly raised,Attach the legs to the main engine with hinges,Install the cement scale,水秤,After weighing the admixture,Ready to lift,Measure and adjust engine chassis,Make it horizontal,After the center line of each leg coincides with the center line of the foundation, the anchor bolt can be poured into the reserved pit (or welded between the base and the reserved embedded part)..2. Installation of other parts: after the installation of the main engine and cement silo,Screw conveyor can be installed,Before hoisting,Check the filling of oil and grease at each lubrication point,An empty car running test is to be conducted,Find problems and solve them in time,Part of the dosing machine installation,Position as required by the foundation drawing,The small dosing machine can be placed on the solid foundation pier plane,Large batching machine requires pouring anchor bolts,After the installation of each mechanical part,Check that all lubrication points of various equipment are filled with lubricating oil (the lubricating oil suitable for low temperature conditions must be replaced in winter in Northeast China) or grease,Wiring and empty car running test can be conducted according to the requirements of the manual and electrical schematic diagram。3. The ground screw bolt of the cement silo is poured to the reserved pit of the foundation. When the center line of the cement silo support is adjusted to coincide with the center line of the foundation, the above four flanges are adjusted on the same level (measurement method: theodolite or transparent plastic hose with diameter of 8-10 and color water measurement method), the concrete can be selected for casting。The grade of the concrete used in the reserved pit should be one level higher than the concrete used in the foundation, and in the winter construction, in order to shorten the construction period, the concrete used should be added with early strength antifreeze。Wait for the foundation concrete to set 5-7 days before installing the cement silo body. When installing the cement silo body, it is necessary to measure the verticality of the cement silo body with a theodolite. The verticality is one thousandth of the height。In order to shorten the construction period,Vertical mixer用途In infrastructure, embedded parts can also be used to fix cement silos or mixers instead of anchor bolts。

Aba high quality vertical mixer use

阿坝优质Vertical mixerConcrete is actually "concrete."。Concrete, referred to as "concrete (tong)" : refers to the aggregate cemented into a whole by the cementing material engineering composite material collectively。Generally speaking, the term concrete refers to the use of cement as a cementing material, sand, stone as aggregate;With water (with or without admixtures and admixtures) according to a certain proportion, by mixing, forming, curing and cement concrete, also known as ordinary concrete, it is widely used in civil engineering。It is made of cementing material, aggregate and water according to a certain proportion of preparation, by stirring vibration molding, under certain conditions of maintenance of artificial stone。优质Vertical mixerConcrete is rich in raw materials,Low price,The production process is simple,So the use of more and more;At the same time, concrete also has high compressive strength,Good durability,Wide range of strength grades,Make it a very wide range of use,Not only used in various civil engineering,The shipbuilding industry,Machinery industry,Ocean exploitation,Geothermal engineering,Concrete is also an important material。The concrete pump is composed of a pump body and a conveying pipe。It is a kind of machine that uses pressure to transport concrete continuously along the pipeline, mainly used in house construction, bridge and tunnel construction。At present, it is mainly divided into gate valve concrete conveying pump and S-valve concrete conveying pump。The other is to install the pump body on the chassis of the car, and then equipped with a telescopic or flexed fabric rod, and composed of a pump truck。

标签